Guidance Note On Notification of Methods of Reinstatement using EToN (Advice Note No 2009 03)
Share
Since the Specification for the Reinstatement of Openings in Highways (SROH) was published in 2002, undertakers have used Sections S6, S7 and S8 to determine the methods of either interim or permanent reinstatements of works in the highway.